Riverbank Army Ammunition Plant, CA
Mr. Curtis Payton
r.c.payton.civ@army.mil
916-267-1246
September 2026

Riverbank Army Ammunition Plant
Sixth Five-Year Review Fact Sheet

Department of War seal

What is a Five-year Review?

The purpose of a five-year review is to determine if remedies at a site are/remain protective of human health and the environment. If any issues that affect protectiveness are found during the five-year review, recommendations are made to address them. The report addresses three major questions:

  • Is the remedy functioning as intended?
  • Are the exposure assumptions, toxicity data, cleanup levels, and remedial action objectives (RAOs) used at the time of remedy selection still valid?
  • Has any other information surfaced that could affect the protectiveness of the remedy?

Site History

The Riverbank Army Ammunition Plant (RBAAP) is in the City of Riverbank in Stanislaus County, CA. RBAAP is a 173-acre facility that consists of large production buildings with numerous support buildings. The main plant consists of 145 acres situated in a primarily rural area. Four Evaporation/Percolation (E/P) ponds cover an additional 28 acres and are located adjacent to the Stanislaus River, about 1.5 miles to the north.

RBAAP was originally constructed in 1942–1943 as an aluminum reduction plant supplying the military. RBAAP was closed under the 2005 Base Realignment and Closure (BRAC). RBAAP is currently leased to the City of Riverbank to operate as a “green industry” business park.

Site Chronology

  • 1980 – Installation Assessment Study: Identified potential hazardous materials release sites.
  • 1987 – Remedial Investigation initiated: Chromium and cyanide identified as contaminants in groundwater.
  • 1990 – National Priorities List (NPL): RBAAP placed on the NPL.
  • 1990 – Interim Groundwater Treatment System: Construction completed.
  • 1992 – Water Supply Extended: City of Riverbank water supply extended to residential areas.
  • 1996 – Landfill: Construction of cap completed.
  • 1997 – Construction complete. Expanded Groundwater Treatment System complete.
  • 2010 – RBAAP closed.
  • 2014, 2017, 2020 – In situ chromium injections.

Site Map

Tap the map to enlarge

Major Developments since Last Five-Year Review

Issues, Follow-up Actions, and Schedule Dates

The issues listed below do not affect current protectiveness because there is no current exposure to chemicals of concern in groundwater and at the landfill.

Protectiveness Summary

Landfill
Short-Term Protective
Groundwater
Short-Term Protective
Sitewide
Short-Term Protective

Contact Information

All publicly available documentation is located at:

Stanislaus County Library, Riverbank Branch
3442 Santa Fe Avenue, Riverbank, California 95367
(209) 869-7008

http://www.stanislauslibrary.org/

Department of War U.S. Environmental Protection Agency Department of Toxic Substances Control California Water Boards – Central Valley Regional Water Board
Site map, enlarged
Download this as a PDF